Custom lithium battery pack design starts with the equipment requirements, rather than a preferred cell or a nominal voltage. Define the operating voltage window, current over time, installation envelope, charging method and acceptance criteria before selecting cells, protection and mechanical interfaces. SICA Energy combines in-house cylindrical and semi-solid-state pouch-cell manufacturing with battery-pack engineering, BMS development and custom manufacturing. The design and delivery scope is agreed for each project. This guide explains the decisions an OEM or ODM team should prepare; it does not prescribe one chemistry, promise a standard BMS feature set or establish compatibility with a particular device. Listed 6S/12S packs remain standard configuration references.
Define an OEM Battery Design Brief
Voltage, Capacity and Duty Cycle
Start with the full electrical window: the equipment's minimum operating voltage, nominal bus voltage and maximum permitted input. Include startup, normal operation, standby and shutdown behavior. A nominal voltage is a convenient label, but two packs with similar labels can have different charge cutoffs and discharge limits. Those differences matter to the charger, controller and protection strategy.
Specify the required operating duration alongside the load profile. Record continuous current, each peak current, peak duration, repetition and recovery interval. Distinguish a motor's startup surge from an operating load that persists. If the device reports power rather than current, provide the measured power profile and corresponding voltage conditions. Capacity in Ah alone does not define usable energy, heat generation or operating duration in the equipment.
Space, Weight and Environment
Provide a drawing showing available volume, mounting features, keep-out areas and cable routing. Mark dimensions as maximum limits or targets and identify the drawing revision. Leave the engineering team to assess necessary assembly and service clearances; a cell outline is not a complete pack envelope.
Describe ambient temperatures, duty cycle, ventilation and possible exposure to vibration, moisture or contaminants. Identify which conditions are already measured and which are design assumptions. These are inputs for assessment, not a statement that SICA offers a particular ingress rating or environmental qualification. A clear distinction between requirements and verified capabilities prevents a promising sample from being mistaken for a qualified production design.
Select Cells and Pack Architecture
Cell Format and Chemistry
Compare the available cylindrical and pouch-cell options against current demand, voltage window, space and mass. SICA manufactures the cylindrical and semi-solid-state pouch cells in its portfolio. That manufacturing capability does not make every cell suitable for every device or establish that all custom packs use the same chemistry.

A cell with greater capacity may have a different continuous-discharge limit or thermal condition. A pouch cell with a higher listed specific energy may require a different mechanical arrangement. Review the exact model and applicable specification, rather than selecting only by a technology label. The technology overview introduces the engineering questions behind those choices.
Series/Parallel and Electrical Interfaces
Series connections establish the pack voltage architecture; parallel arrangements affect available capacity and current sharing. The selected cell limits, interconnections, protection and assembly constraints must be reviewed together. Increasing parallel count is not evidence that a proposed pack will meet a particular continuous-current requirement without validation.
Document the equipment-side connector, polarity, cable routing and charging interface. If the device requires communication, provide the protocol specification and expected behavior, including startup and fault handling. BMS development is a confirmed SICA capability, but support for an individual communication protocol is agreed per project. For an initial reference, compare the eight standard LiPo/LiHV configurations; these do not define the full scope of custom engineering.
Design BMS, Protection and Thermal Strategy
Monitoring and Safety Features
A BMS discussion should begin with required behavior, not a list of assumed features. Identify which measurements the device needs, how faults should be handled, and which functions belong to the pack or to the equipment controller. Protection thresholds need to correspond to the selected cells and the complete system voltage and load envelope.

Define responsibility for firmware requirements, communication, equipment integration and approval. Where a project calls for balancing, logging or other functions, request explicit confirmation of scope rather than assuming they are present. Neither this guide nor a standard pack listing establishes that every pack includes a BMS, or that a particular BMS implements all possible functions.
Cooling, Enclosure and Connectors
Thermal evaluation should consider the actual load sequence, ambient conditions, enclosure and available heat paths. A cell's maximum permitted value is not a substitute for evaluating temperature rise inside the proposed assembly. The mechanical layout and current path can influence the final design as much as the headline capacity.
Agree who designs and approves the enclosure, mounting and connectors. Identify service access, assembly clearances and any customer-supplied parts. An interface drawing should state polarity and revision as well as nominal size. This is a design checklist, not an assertion that a specific connector, cooling system or enclosure is already qualified for the project.
Prototype, Test and Manufacture
Sample Validation
For an OEM project, the customer brings an existing design, specification or manufacturing requirement. For an ODM project, the parties work from equipment needs to define the design and manufacturing brief together. In either case, agree the sample configuration and acceptance criteria before treating a prototype as representative of the intended product.
SICA's in-house quality validation includes cycle testing and discharge evaluation under different temperature conditions. The applicable methods, samples, conditions and deliverables must be defined for the project. The in-house testing overview explains this quality role; it is not an offer of independent third-party testing. Any required accredited certificate or independent report needs separate scope confirmation.

A useful validation matrix separates cell checks, pack checks and equipment-level checks. Assign an owner to each requirement, record the configuration tested, and state what evidence is needed to accept it. This avoids extending a cell result to a complete device or using one sample's behavior as a universal production claim.
Production Documentation and Change Control
Before proceeding toward supply, agree the approved specification and the drawings or interface records needed for the project. Record which items are customer-controlled and which are supplied by SICA. Sample acceptance should refer to an identifiable configuration so later changes can be evaluated against the same baseline.
The following table is a suggested review framework, not a promise of a fixed document package or a standard project schedule. Confirm the actual records and approval responsibilities during the engineering discussion.
Scroll horizontally to compare all columns, if needed. →
| Review point | Information to agree | Decision supported |
|---|---|---|
| Requirements | Voltage window, load sequence, physical limits | Feasibility and open questions |
| Architecture | Cell model, configuration, interfaces, protection scope | Proposed design boundary |
| Sample review | Sample identity, conditions, acceptance criteria | Evaluation and necessary revisions |
| Supply preparation | Approved specification, change responsibilities, quantities | Agreed manufacturing scope |
Prepare a High-Quality RFQ
Technical Data Checklist
Send a brief that distinguishes mandatory limits from preferences. Include equipment purpose, target market, load traces or current/time requirements, voltage limits, installation drawings, mass target, charger information, connectors and communication requirements. If a preferred cell or standard pack is involved, provide the exact model and explain why it is being considered.
Include the validation responsibilities and documentation requirements in the same request. The existing battery-pack RFQ checklist provides a shorter submission guide. This article supports the earlier design decisions; the custom pack manufacturing page remains the main commercial entry point for OEM/ODM engineering and supply discussions.
MOQ, Schedule and Market Needs
State sample quantity, anticipated order quantity, destination market and the evaluation milestones you need to meet. MOQ, sample availability and lead time depend on the selected model and project scope and must be confirmed. Do not build a launch plan around an assumed universal minimum quantity or delivery period.
Request model-specific specifications and applicable drawings, and identify any regulatory documents the final equipment may require. A document for a different model, chemistry or assembly cannot settle the requirement. Missing inputs can be listed as open items in the brief rather than replaced with guesses.
Explore Custom Battery Pack Manufacturing to review the commercial scope. To Discuss a Custom Battery Pack Project, submit your equipment brief through the existing inquiry route. Submit Your Electrical and Mechanical Requirements with the available drawings and load information identified; agree how supporting files should be supplied during follow-up. A technical discussion establishes the next review step, not an automatic design approval or supply commitment.